West Holborn Renewable Energy Network (WHREN)
Future phases
Following the drilling works, and subject to funding and planning permission, Phase 2 will see the development of an energy centre and pipe distribution network.
Overall, the scheme is likely to combine:
- a mine water heat pump
- a combined heat and power (CHP) back-up system
- solar panels
- a private wire electrical network with storage battery
- wood gasification plant